Erasito Consultants Limited carried out the structural upgrading of an existing electrical substation and switch room that was damaged by fire for the Harbour Centre Building in Suva.
Client: Fiji National Provident Fund
Project Value: F$0.25M
Erasito Consultants Limited carried out the structural upgrading of an existing electrical substation and switch room that was damaged by fire for the Harbour Centre Building in Suva.
Client: Fiji National Provident Fund
Project Value: F$0.25M