Categories: Geotechnical Investigations

Reservoir Road Terminal

Erasito Consultants Limited were commissioned by BP South West Pacific Limited to undertake the Geotechnical Investigation works to determine the Tank foundation design for the SU2 petroleum tank to be erected at the BP Reservior Road Terminal. The Company has also been involved in the civil works design, tender documentation and evaluation and construction supervision …

Reservoir Road Terminal Read More »

Foundation Remedial Works, Walu Bay

Erasito Consultants Limited were engaged to carry out soil investigations and provided recommendations to rectify a differential settlement problem that a 22m diameter, steel, petroleum tank was experiencing at the Mobil Tank Farm in Walu Bay, Suva.

Waila Town Subdivision

Erasito Consultants Limited were commissioned by the Housing Authority to undertake a Geotechnical Investigation to determine the soil strength and parameters for the earthworks design of the proposed new Waila Town Subdivision. The Subdivision is approximately 280 hectares in area. ECL were also commissioned to produce an Infrastructure Scoping Report of the proposed development.