Erasito Consultants Limited were engaged to construct a 2,000m3 hardstand area within the Coca Cola property at Laucala Beach Estate. The design work involved the selection of a grading curve for top course and base course aggregates together with required pavement thicknesses. A second hardstand area required sealing with a bituminous, two coat, chip seal. Each hardstand area was 2,000m3 in plan.
Client: Coca Cola Amatil Fiji Limited
Contract Value: F$66,000.00