F.S.C. Bridge Design and Wing Wall Failure

Erasito Consultants Limited were engaged to undertake the design work associated with the rehabilitation and remedial work on Bridge No. 4 at the Rarawai Mill in Ba. The bridge suffered severe damage during heavy rains and flooding of the waterways which was experienced in the Western Division of Fiji and resulted in a partial collapse of the existing wing wall. The design work involved H-pile design and the design of a new wing wall.

Client: Fiji Sugar Corporation (FSC)
Project Value: F$60,000.00